
Charged Aerosol Detectors
Corona Veo and Corona Veo RS
Operating Instructions Page 23
3 Installation
3.1 Facility Requirements
In addition to the facility requirements and safety information below, observe the
precautionary statements in section 1.2.2 (→ page 4).
Site Requirements
The installation site must meet the following requirements:
• The main power switch and the main power receptacle are on the rear panel. Make sure
that
♦ Free and unrestricted access to the main power switch is ensured at all times.
♦ The power cord of the device can be easily reached and disconnected from the power
line at all times. Provide sufficient space behind the device to unplug the cable.
• The installation site must meet the power and environmental specifications listed in the
'Technical Information' section (→ section 9, page 121).
• Install the detector in the laboratory on a stable, flat surface that is free of vibrations.
• The detector should have approximately 65 cm of linear bench space. The bench top
should be at least 65 cm deep.
• Make sure that the surface is resistant to solvents.
• Avoid locations with extreme changes in temperature, such as near air conditioning vents
or locations with air drafts.
• Avoid locations with direct sunlight and high humidity.
• Allow sufficient clearance behind and to the sides of the detector for easy access to
power connections, the main power switch, gas connections and ventilation. Maintain at
least a 15 cm clearance behind the detector from any vertical surface.
• Install the detector in a location that provides access to a power outlet, nearby gas supply
and ventilation sources. Place the detector in a position such that all appropriate rear
panel connections to the system are possible.
• An uninterruptible power supply (UPS) may be necessary for electrical lines that are
susceptible to large power fluctuations.
Kommentare zu diesen Handbüchern